NVIC 17-14 – officers in charge of an engineering watch

No. NVIC Task Description Location
1. 1.1.A Pre watch inspection OICEW-4-1A in EN‑4231
2. 1.1.B Keep watch (Motor) OICEW-4-1C in EN‑4231
3. 1.1.C Keep watch (Steam) OICEW-4-1C in EN‑4231
4. 1.1.D Keep watch (Gas Turbine) OICEW-4-1C in EN‑4231
5. 1.1.E Maintain log book OICEW-4-1C in EN‑4231
6. 1.1.F Hand over the watch OICEW-4-1B in EN‑4231
7. 1.2.A Change-over to local control systems OICEW-1E2A in EN‑3233
8. 1.3.A Identify and respond to alarms OICEW-4-2A in EN‑4231
9. 1.3.B Take immediate action (fire) MT‑1111
10. 1.3.C Take immediate action (accident) MT‑1111
11. 1.3.D Take immediate action (oil system fire or accident) MT‑1111
12. 1.4 ERM EN‑4234
13. 2.1 English ST‑0999
14. 3.1.A Test internal communications OICEW-5-1A in EN‑4231
15. 4.1.A Understand equipment operating principles EN‑2111
16. 4.1.B Light off boiler OICEW-5-2A in EN‑3131
17. 4.1.C Secure boiler OICEW-5-2B in EN‑3131
18. 4.2.A Understand safety and emergency procedures for propulsion machinery EN‑4131
19. 4.2.B Respond to propulsion boiler carry-over EN‑3131
20. 4.2.C Prepare propulsion diesel engine for operation OICEW-5-1J in EN‑4231
21. 4.3.A Prepare steam turbine for operation OICEW-5-1L in EN‑3233
22. 4.3.B Prepare gas turbine for operation OICEW-4-3B in EN‑3233
23. 4.3.C Monitor diesel engine operation OICEW-4-1D in EN‑2231
24. 4.3.D Monitor steam turbine operation OICEW-5-1M in EN‑3233
25. 4.3.E Monitor gas turbine operation OICEW-4-3E in EN‑3233
26. 4.3.F Secure propulsion diesel OICEW-5-1K in EN‑4231
27. 4.3.G Secure steam turbine operation OICEW-5-1N in EN‑3233
28. 4.3.H Secure gas turbine operation OICEW-4-3H in EN‑3233
29. 4.3.I Monitor auxiliary boiler OICEW-4E3I in EN‑3131
30. 4.3.J Test boiler water OICEW-5-2D in EN‑3131
31. 4.3.K Treat boiler water OICEW-5-2D in EN‑3131
32. 4.3.L Bottom blow boiler OICEW-5-2C in EN‑3131
33. 4.3.M Change over low pressure air compressor OICEW-5-1D in EN‑2111
34. 4.3.N Start fresh water generator OICEW-5-1F in EN‑4231
35. 4.3.O Shut down fresh water generator OICEW-5-1G in EN‑4231
36. 4.3.P Start fresh water distiller OICEW-5-1F in EN‑4231
37. 4.3.Q Shut down fresh water distiller OICEW-5-1G in EN‑4231
38. 4.3.R Start oil purifier OICEW-5-1H in EN‑3233
39. 4.3.S Shut down oil purifier OICEW-5-1I in EN‑3233
40. 4.3.T Start refrigeration system OICEW-5-1B in EN‑3213
41. 4.3.U Monitor refrigeration system OICEW-4-1D in EN‑2231
42. 4.3.V Secure refrigeration system OICEW-5-1C in EN‑3213
43. 4.3.W Start and secure a reverse osmosis plant OICEW-5-1F in EN‑4231
OICEW-5-1G in EN‑4231
44. 5.1.A Understand pumps, piping systems and controls EN‑1211
EN‑2111
EN‑3216
45. 5.2.A Transfer fuel OICEW-6-1A in EN‑3131
46. 5.2.B Ballast a tank OICEW-5E2B in EN‑3131
47. 5.2.C De-ballast a tank OICEW-5E2B in EN‑3131
48. 5.2.D Pump engine room bilges OICEW-6-2A in EN‑2231
49. 5.2.E Pump cargo-hold or shaft alley bilges OICEW-6-2A in EN‑2231
50. 5.3.A Monitor oily-water separator OICEW-9-1C in EN‑2231
OICEW-4-1D in EN‑2231
51. 6.1.A Understand electrical generation and distribution EN‑3111
52. 6.1.B Inspect and start a diesel generator OICEW-7-1A in EN‑4131
OICEW-7-1B in EN‑4131
OICEW-7-1D in EN‑3233
53. 6.1.C Inspect and start a steam turbo-generator OICEW-7-1C in EN‑3233
54. 6.1.D Change over generators OICEW-7-1D in EN‑3233
OICEW-7-1E in EN‑3111L
55. 6.1.E Understand motor controllers, sequential control, and high voltage EN‑3111
EN‑3111L
EN‑3216
56. 6.2.A Understand basic electronics EN‑3212
57. 6.3.A Understand automation and control systems EN‑3216
58. 7.1.A Conduct insulation resistance test OICEW-3-1D in EN‑4231
OICEW-7E4A in EN‑4231
59. 7.2.A Troubleshoot motor controller OICEW-3-1B in EN‑3111L
60. 7.2.B Repair faulty motor controller OICEW-3-1B in EN‑3111L
61. 7.3.A Detect location of grounds OICEW-3-1C in EN‑4231
62. 7.4.A Disassemble and reassemble an electric motor OICEW-7E4A in EN‑4231
63. 7.5.A Respond to engine alarms OICEW-4-2A in EN‑4231
OICEW-4-1C in EN‑4231
64. 7.5.B Test steering gear OICEW-5-1A in EN‑4231
65. 7.5.C Test low lube oil shutdown device OICEW-7E5C in EN‑4131
66. 8.1.A Machine shop projects OICEW-1-1G in EN‑2112
OICEW-8-1A in EN‑2112
EN‑2112
67. 8.1.B Welding projects OICEW-1-1B in EN‑2112
OICEW-1-1C in EN‑2112
OICEW-1-1F in EN‑2112
OICEW-1-1G in EN‑2112
EN‑2112
68. 8.1.C Oxy-acetylene cutting project OICEW-1-1A in EN‑2112
69. 8.2.A Make emergency/temporary repairs OICEW-8E2A in EN‑1211
70. 8.2.B Replace a mechanical seal or repack a pump OICEW-8E2B in EN‑2111
71. 8.2.C Repack a valve OICEW-8-2E in EN‑1211
72. 8.2.D Replace a flange gasket OICEW-8E2D in EN‑2231
73. 8.3.A Clean an oil purifier OICEW-8E3A in EN‑4131
74. 9.1.A Overhaul a centrifugal pump OICEW-8-2A in EN‑2111
OICEW-8E2B in EN‑2111
75. 9.1.B Tighten pump packing OICEW-8-2A in EN‑2111
OICEW-8E2B in EN‑2111
76. 9.1.C Overhaul a reciprocating pump OICEW-8-2B in EN‑2111
77. 10.1.A Start and secure sewage treatment system OICEW-9-1B in EN‑2231
78. 10.1.B Start and secure oily-water separator OICEW-10E1B in EN‑3131
79. 11.1.A Determine stability data for vessel EN‑4151
80. 11.2.A Ensure watertight integrity of the ship EN‑4151
81. 11.3.A Respond to partial loss of intact buoyancy EN‑4151
82. 11.4.A Identify ship’s structural members EN‑4151
83. 12.1 Firefighting A-VI/1-2
A-VI/3
84. 13.1 Lifesaving A-VI/2-1
85. 14.1 Medical Aid PE‑0032
86. 15.1.A Understand SOLAS, MARPOL and STCW Conventions. SS‑4123
87. 16.1.A Describe duties and responsibilities of vessel personnel MT‑1111
88. 16.2.A Describe maritime laws and conventions SS‑4123
89. 16.3.A Take on bunkers ABE-1-6A in EN‑1211
CC‑LEAD
90. 16.4.A Supervise a fire or emergency team FF‑0108
91. 17.1 Personal Safety A-VI/1-1
A-VI/1-2
A-VI/1-3
A-VI/1-4