Condition
On an operational ECDIS that meet the standards of IMO resolution MCS.232(82) 5 Dec 2006 revised performance standards for Electronic Chart Display and Information Systems (ECDIS) or an ECDIS simulator that meets applicable national and international performance standards for ECDIS.
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Demonstrate converting the Route Plan to a Route in preparation for sailing. |
Demonstrate loading route and activating route within 45 seconds. |
Location
Assessed in MT‑3224 Electronic Chart Display & Information System (ECDIS).