Condition
On a vessel or a full mission ship simulator.
Behavior |
Standard |
The student will: |
During assessment, the student shall, at a minimum: |
Conduct the pre-departure test of the vessel’s steering gear.
|
- The steering control system is turned on.
- The steering gyro repeater is aligned with the master gyro-compass.
- After the required warm up period, the controls for switching pumps and motors between the port and starboard steering systems are tested.
- Both port and starboard steering systems are tested as follows:
- When the control is switched to hand steering, the rudder is tested throughout its full range of motion.
- When the control is switched to non follow-up, the rudder is tested throughout its full range of motion.
- Change the steering mode from auto plot to hand and back.
|
Location
Assessed in MT‑4371 Sea Term IV: Marine Transportation.
References
STCW Knowledge, Understanding and Proficiency
- OICNW-A1.08
- RFPNW-X1.3
NVIC Tasks
- NVIC 06-14 Task 1.3.A * Change the steering mode from auto pilot to hand steering*
- NVIC 06-14 Task 1.3.B * Change the steering mode from hand steering to autopilot*
- NVIC 12-14 Task 1.8.A Steering gear test
or MT‑3372. Shall be completed by the end of [ MT‑4371.