Condition
On a vessel of at least 1,000 HP, or in a laboratory or workshop.
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Secure the leaking pipe |
|
Make a temporary repair using a prefabricated repair clamp, or |
|
Make a temporary repair using a soft patch |
|
Test repaired pipe for leakage |
|
Location
Assessed in EN‑1211 Auxiliary Machinery I.
References
STCW Knowledge, Understanding and Proficiency
NVIC Tasks
- NVIC 17-14 Task 8.2.A Make emergency/temporary repairs
See the Assessment Guidelines for additional specifications of behavior and standards.