Condition
On a gas-turbine vessel of at least 1,000 HP at sea, on a simulator, or in a laboratory
Performance requirement
Behavior | Standard |
---|---|
The student will: | During assessment, the student shall, at a minimum: |
Check for sufficient electrical capacity |
|
Prepare main gas turbine for start |
|
Start main gas turbine engines |
|
Location
Assessed in EN‑3233 Steam and Gas Turbines.
References
STCW Knowledge, Understanding and Proficiency
NVIC Tasks
- NVIC 17-14 Task 4.3.B Prepare gas turbine for operation
See the Assessment Guidelines for additional specifications of behavior and standards.